The terms you meet when building and running a charging site. From the grid connection to invoicing the driver.

Site energy

Reserved capacity
The level of grid draw agreed with the distribution operator. You pay for it even when you do not use it.
BESS
Battery Energy Storage System. It covers the peak the grid would otherwise have to deliver.
Peak shaving
Trimming the demand peak from the battery. It lowers reserved capacity and the capacity charge.
DC-DC microgrid
Linking the grid, photovoltaics and a battery on the DC side. It delivers more power than the grid connection can carry.
Load management
Sharing power between stations so that total draw stays within the agreed capacity.

Charging and hardware

AC vs DC
AC charges through the converter in the vehicle (slower, cheaper to install), DC feeds direct current straight into the battery.
CCS2
Combined Charging System 2 - the European connector standard for direct current charging.
Eichrecht
German metrology rules for charging measurement. They require a verifiable record of the energy delivered.

Network operation and software

OCPP
Open Charge Point Protocol - an open protocol between the station and the platform. It lets you manage hardware from other manufacturers too.
OCPI
Open Charge Point Interface - a protocol for exchanging data between networks. The basis of roaming.
CPO
Charge Point Operator - the operator of charging stations. Responsible for technical operation, pricing and availability.
EMSP
E-Mobility Service Provider - the provider of the service to the driver. Issues the card or app and invoices the charging.