Knowledge hub
The terms you meet when building and running a charging site. From the grid connection to invoicing the driver.
Site energy
- Reserved capacity
- The level of grid draw agreed with the distribution operator. You pay for it even when you do not use it.
- BESS
- Battery Energy Storage System. It covers the peak the grid would otherwise have to deliver.
- Peak shaving
- Trimming the demand peak from the battery. It lowers reserved capacity and the capacity charge.
- DC-DC microgrid
- Linking the grid, photovoltaics and a battery on the DC side. It delivers more power than the grid connection can carry.
- Load management
- Sharing power between stations so that total draw stays within the agreed capacity.
Charging and hardware
- AC vs DC
- AC charges through the converter in the vehicle (slower, cheaper to install), DC feeds direct current straight into the battery.
- CCS2
- Combined Charging System 2 - the European connector standard for direct current charging.
- Eichrecht
- German metrology rules for charging measurement. They require a verifiable record of the energy delivered.
Network operation and software
- OCPP
- Open Charge Point Protocol - an open protocol between the station and the platform. It lets you manage hardware from other manufacturers too.
- OCPI
- Open Charge Point Interface - a protocol for exchanging data between networks. The basis of roaming.
- CPO
- Charge Point Operator - the operator of charging stations. Responsible for technical operation, pricing and availability.
- EMSP
- E-Mobility Service Provider - the provider of the service to the driver. Issues the card or app and invoices the charging.