More power than your grid connection allows
Where you would normally need costly grid reinforcement, we combine the grid connection, photovoltaics and batteries to deliver the power your chargers need.
Grid connection
100 kW
Photovoltaics
PV
Battery storage
BESS
Polyfazer Energy Hub
DC-DC microgrid
Combines the sources on the DC side, with no needless conversions.
We also build AC-DC microgrids. DC-DC is newer and more efficient.

At the charger
up to 800kW
Eight times the grid connection power.
No grid reinforcement
No waiting for a distribution operator assessment, no investment in your own substation.
Peak shaving
Lower reserved capacity - you pay for the peak you actually draw from the grid.
Extra income
Energy arbitrage and self-consumption from photovoltaics. The battery works even when no one is charging.
Lower capacity charges
The battery covers the peak, from the grid you draw only the average load of the site.
How much power can your site take?
Enter the number of cars and the capacity of your grid connection. In two minutes we tell you whether you need BESS.